Orkyo schedules jobs onto the machines, people, and tools that run them. That's the whole job. Several established software categories sound like that from the outside and aren't, so here is where each boundary sits.
Not an MES or shop-floor control system
Orkyo does not drive machines, collect signals from the floor, dispatch work to terminals, or track operation-by-operation progress. In German terms: it is Produktionsplanung, not Fertigungssteuerung.
Not a CMMS, tool crib, or inventory system
Orkyo does not track stock levels, consumables, spare parts, tool wear, or maintenance work orders. You can keep a maintenance or calibration log on a machine as a list of entries — Orkyo will hold that record, but it will not raise the work order, order the part, or tell you when the next service is due. If you're looking for machine-shop tool management or inventory management, that's a different product.
Not an ERP or MRP system
No bills of material, purchasing, invoicing, payroll, or accounting. If your planning already happens inside SAP, Oracle, or a DATEV-connected suite, you have committed to ERP-embedded planning and Orkyo is not the tool to bolt on.
Not a floor-plan or CAD drawing tool
Orkyo is not for designing a layout, drafting blueprints, or producing an architectural floor plan. It won't help you lay out a new building. The shapes you draw are there to be booked, not to be dimensioned.
Not an APS or fine-scheduling optimizer
Orkyo does not sequence operations minute-by-minute on a line or solve for the mathematically optimal order of jobs. It does record the order you already know: a task can wait for the ones before it, and the plan respects that at day granularity. What it will not do is search for the optimal sequence on your behalf. Day-granularity planning is a deliberate choice, not a missing feature.
What Orkyo does do
- Schedules jobs onto machines, people, and tools in one plan
- Surfaces capacity conflicts the moment they're created, not on the floor
- Tracks utilization so you can see which resource is actually the bottleneck
- Plans several sites in one place, with roles controlling who can change what
The feature list covers this in detail, the documentation covers how it's modelled, and machine shop scheduling walks through one concrete case.